A floor truss is a flat, open-web truss that carries a floor the way a joist does. Open-web means it is built from top and bottom boards joined by short boards, with open space between them for ducts, pipes and wiring. Western builds floor trusses in Wheatland, Wyoming to your floor plan and delivers them to your job site.

Built in
Wheatland, Wyoming
Lead time
3 to 6 weeks
Delivery
11 states
Price reply
Within 48 hours

What floor trusses are used for.

Floor trusses are built to length for your floor and set on walls, beams or posts. Because a floor truss can be made deeper than a lumber joist, it can cover a longer span between supports. In post-frame and barndominium buildings, they carry:

Floor trusses vs joists and I-joists.

A joist is a single board, such as a 2x10 or 2x12, set on edge to hold up a floor. An I-joist is a factory-made joist shaped like the letter I: a thin panel standing on edge between a top and a bottom strip, called flanges. All three hold up floors. Here is how they differ.

Floor trusses compared with solid joists and I-joists
TopicFloor trussesSolid joistsI-joists
How it’s madeBuilt in a plant to your floor plan, with steel connector plates at every joint.One piece of sawn lumber.Made in a factory and sold in long lengths.
Ducts, pipes and wiringRun through the open web. A chase for a main duct can be designed in.Through holes drilled within the limits the building code allows.Through holes in the web where the maker’s guide allows.
Cutting on siteBuilt to length. Do not cut without the truss designer’s approval.Cut to fit on site.Cut to length on site.
OrderingDesigned and built to order. Ours take 3 to 6 weeks from order confirmation.Stocked at lumberyards.Sold by many lumberyards.

Floor trusses make sense for long spans and for floors with a lot of ductwork and plumbing. Solid joists or I-joists make sense for short spans, small jobs, or when lengths need adjusting on site.

Running ducts, pipes and wiring.

The open web is the main reason people choose floor trusses. Get the most from it by planning early.

  • Plan the runs first

    Mark where the main duct, drains, water lines and wiring go before you order, so the trusses are laid out around them.

  • A chase for the main duct

    A wider open bay, called a chase, can be designed into the trusses to carry a large duct.

  • Never cut a truss to make room

    Cutting or notching a chord or web can weaken the truss. If a run changes, ask the truss designer first.

What we need to price your floor trusses.

Size, use and a zip code is enough to start. Send as much of this list as you have.

Get a Price

We reply to every price request within 48 hours.

  • Floor planThe floor’s size and where it is supported: walls, beams or posts.
  • What it will carryLiving space, storage, a shop loft, or heavy items such as a large tub or a safe.
  • Floor finishTell us if the floor will get tile or stone, so the design accounts for it.
  • Ducts and plumbingWhere the main duct, drains and water lines run.
  • Height limitsHow deep the floor can be, if headroom below or above is tight.
  • Build-site zip codeWhere the trusses are going, for delivery and design.
  • Plans or a sketchPlans, a drawing from our free 3D designer, or a napkin sketch.
  • TimelineWhen you need them on site.

How ordering and delivery work.

Four steps, from your plans to your job site.

  1. Step 1: Send your plans

    Use the Get a Price form, send your plans or call (307) 322-2888. A sketch is enough to start. We reply to every price request within 48 hours.

  2. Step 2: We design them for your site

    Your floor trusses are designed for your building and your site’s snow and wind loads. A Western package includes stamped, site-specific drawings, ready to hand to the building department.

  3. Step 3: We build them in Wheatland

    Typical production time is 3 to 6 weeks from order confirmation, depending on the size of the job, current production volume and material availability. You get a specific timeline when you order.

  4. Step 4: We deliver them

    On our own flatbeds to Wyoming, Colorado, South Dakota, Nebraska, Kansas, Montana, Idaho, Utah, New Mexico, Texas, and Nevada. The driver sets the load with an onboard forklift where your crew wants it. Delivery is priced separately and quoted by distance.

We supply; we don’t build. Western makes and supplies materials and does not put up buildings. If you need a crew, our contractor network can help. Find a builder

Floor truss questions.

What is a floor truss?

A flat truss that carries a floor the way a joist does. It is made of top and bottom boards (chords) joined by short boards (webs) with steel connector plates, leaving open space between the webs.

Are floor trusses better than joists?

They suit different jobs. Floor trusses are a good fit for long spans and floors with a lot of ductwork and plumbing, because the open web leaves room for them. Solid joists and I-joists suit short spans and jobs where lengths need adjusting on site.

Can you run ducts and plumbing through floor trusses?

Yes, through the open web. Plan the runs before you order so the trusses are laid out around them, and so a wider opening for the main duct, called a chase, can be designed in.

Can floor trusses be cut to length on site?

Floor trusses are built to length for your floor. Do not cut or notch them without the truss designer’s approval.

How much do floor trusses cost?

The price depends on the span, the depth, how many you need and what the floor will carry. Delivery is priced separately and quoted by distance. Send your floor plan for a price; we reply within 48 hours.

How long do floor trusses take?

Typical production time is 3 to 6 weeks from order confirmation, depending on the size of the job, current production volume and material availability.

Do you deliver floor trusses to the job site?

Yes, on our own trucks to Wyoming, Colorado, South Dakota, Nebraska, Kansas, Montana, Idaho, Utah, New Mexico, Texas, and Nevada. Delivery is priced separately and quoted by distance.

Western Building Supply team member cutting lumber for custom trusses in the Wheatland shop

Get a price on your floor trusses.

Send your floor plan or a sketch, what the floor will carry and your build-site zip code. We reply within 48 hours.